The much-used Union Ballroom needed a new look, but the event schedule for the space would only allow 7 weeks for the entire remodel. In addition, the entire 7,000 square foot wood floor had to be protected from damage during the project. These challenges were met and the project finished ahead of schedule with the new look exceeding expectations.
The upgrades to the Ballroom included all new LED lighting, a new sound system, new ceilings, closing off the sixth floor open balcony, and a new Feature Wall that be the used as the backdrop for Ballroom events