The Home Sweet Home Expansion is in the home stretch. Job superintendent Dan Connelly and crews are busy in and outside of the project. With the help of a crane, rooftop condensing units, the DOAS (dedicated outdoor air system) unit and generator have been installed. The interior finishes are well underway, with cabinets being set throughout, the epoxy floors have been applied and trim being installed.