blog_big_pic
March 17th 2023

Box Culvert at The Crossing at KU

The Crossing at KU has a greenway that runs from Clinton Parkway all the way to Becker Drive. The greenspace will have concrete trails that connect to trails already in place. The trail path will be landscaped and will feature a lake that has a surface area slightly over 4 acres. The photos are the poured concrete structure that funnels water from the lake and thru the dam. 250+ yards of structural concrete and several tons of epoxy rebar were used in the making of the structure. Brandon Abel, jobsite superintendent captured these photos from overhead.