The storefront system at the Douglas County Treatment & Recovery Center project is being installed with glazing to be coming soon. Outside the metal skin of the building is being applied. Things are changing rapidly as we near completion but there is still a lot to do. The canopy over the front entry is beginning to take shape and crews are grading the site getting ready to place concrete curbs and asphalt for the new parking lot on the east side of the property. Keep checking back as Dan Connelly, superintendent, keeps things moving along.