Things are moving right along at the PBPB Health Center C-Wing Addition. Job superintendent Randy Frahm and crews have completed the slab on grade for the building pad. The exterior metal stud framing has been completed and the wall sheathing installed. Interior wall framing is underway prepping the project for the roof framing.